Case Study: Commercial & Industrial (MPB) – Phase 7
The Project:
Client:
A northwest manufacturing business manufacturing high quality sustainable packaging. Client had previously instructed Powersave in relation to a multi-phase modernisation program over several years, adding to and improving manufacturing, warehouse and industrial premises.
The Property:
A late 1960’s building, comprising:
- Factory
- Offices
- Internal mezzanine for storage
Problems to Address:
Need for more and improved space for:
- Manufacture
- Increased production
- Staff, clients, visitors
Options:
- Re-locate
- Demolish & Rebuild
- Refurbish & Improve
Our Solution:
After consulting with Powersave Installations Limited, the decision was taken to undertake a refurbishment project, to be delivered in 7 phases.
Phases:
Phase 1 – Improve Factory Lighting
Phase 2 – Demolish Disused Building for Access
Phase 3 – Welfare Block Construction
Phase 4 – Office Refurbishment
Phase 5 – Increase Manufacturing Floor Space
Phase 6 – Improve Lorry Park & Delivery Area
Phase 7 – Improve storage capacity. Build on Area 6 a new steel frame building extension with LED lighting and power for additional storage of manufactured goods and improved ingress/egress to delivery area and lorry park.
All above to be undertaken without stopping ongoing production and processes.
Factory Plan:
Work Areas:
Area 1 – LED lighting installed to shop floor
Area 2 – Redundant tower demolished
Area 3 – Redundant, disused, semi-derelict area for new welfare block
Areas 4 & 5 – Old office area 4 becomes an improved office area, extended south. Area 3 will be freed up for extra manufacturing.
Area 6 – External lorry parking and turning. To be extended and resurfaced. New steel frame building to be constructed immediately adjacent to existing building and over Area 2.
Overall Objectives:
Objective 1: Improve business space
- Plus 1: Improve factory facilities for staff and clients
- Plus 2: Improve non-factory space heating
- Plus 3: Improve insulation
- Plus 4: Improve available storage space to factory
- Plus 5: Improve ‘goods out’
Objective 2: Improve and modify lighting
- Plus 1: Improve emergency lighting
- Plus 2: Improve electrical safety
Objective 3: Reduce energy consumption
Objective 4: Reduce carbon emissions
Demolition, Build & Fit:
Demolition Project:
Phase 1 Build & Fit-Out:
Phases 1 & 2, Completed:
Phase 1 – Improve Factory Lighting:
Testimonial
Following the new LED lighting installation and the energy saving control modifications at our Hindley Green plant which have now been completed and tested I would like to complement you and Simons team for a well-run job!
Following your details being passed to us by the Business Growth Hub your response for the site assessments and quotes where completed very quickly with the lighting specifications and also extensive energy saving details which help me to get the go ahead for the project.
The installations where carried out professionally to the method statements and risk assessments supplied and without any hold ups to our production requirements on site also the guys kept the working area controlled and tidy and the installation was finished ahead of schedule.
I have no hesitation in recommending Powersave for the installation of LED lighting and general electrical installations and we will be asking them to assist us with a number of new installations this year across our 3 sites.
Phase 2 – Demolish Disused Building To Improve Access:
Phase 3 Before & After:
Phase 3 – Before:
Phase 3 – After:
Phase 6 Improve Lorry Park & Delivery Area, Before & After:
Phase 6 – Before:
Phase 6 – After:
Phase 7 Construct New Steel Frame Building Adjacent to Main Building and Lorry Park & Delivery Area
Phase 7 – During:
Phase 7 – After:
Achieving
The Project
Objectives
Objective 1: Yes – Improved lighting quality & reliability
Objective 2: Yes – Reduced kWh energy consumption
Objective 3: Yes – Reduced carbon emissions
Objective 4: Yes – Improved & usable space
Objective 5: Yes – Nil loss of time & production
Objective 6: Yes – Increased return from building
Company Details:
Powersave Installations Ltd.
Company No.: 08688807
Registered Office:
200 Drake Street
Rochdale, Greater Manchester
OL16 1PJ
We are on:
Accreditations:



Our relevant project contractors are: