Services

EICR testing in Yourtown

Electrical Installation Condition Reports for landlords, homeowners, buyers and businesses. Clear reports, fair prices and quick turnaround.

What is an EICR?

An Electrical Installation Condition Report is a detailed inspection and test of the fixed wiring in a property. It identifies anything that is damaged, deteriorated, defective or does not meet current safety standards.

Landlords in England must have an EICR at least every 5 years and give a copy to tenants. Homeowners are advised to have one every 10 years or when buying a property.

  • Satisfactory or unsatisfactory result explained clearly
  • Report emailed within 24 hours
  • Fixed price remedial quotes
  • Reminders when your next test is due

What the inspection covers

A thorough check of your installation, carried out to BS 7671 and IET Guidance Note 3.

Consumer unit inspection

Checking the condition, rating and labelling of your fuse board and protective devices.

Circuit testing

Continuity, insulation resistance and polarity tests on every circuit.

RCD testing

Making sure your RCDs trip fast enough to protect against electric shock.

Earthing and bonding

Checking the main earth and bonding to gas and water pipes.

Sockets, switches and fittings

Sampling accessories for damage, overheating and loose connections.

Coded observations

Any issues are coded C1, C2, C3 or FI so you know what is urgent.

EICR prices

Fixed prices for most properties. Larger or commercial installations are quoted individually.

Example prices shown. Edit these to match your own pricing.

Questions about eicrs

Everything landlords and homeowners ask about EICRs.

How long does an EICR take?

Most homes take 2 to 4 hours. The power will be off for short periods while circuits are tested.

What do C1, C2 and C3 mean?

C1 means danger present, C2 means potentially dangerous, and C3 means improvement recommended. C1 or C2 codes, or an FI, make the report unsatisfactory.

What happens if my report is unsatisfactory?

We will give you a fixed quote for the remedial work. Landlords must complete it within 28 days, or sooner if stated.

Do I need to be there?

Someone needs to give access. Landlords can arrange access with tenants and we will liaise with them directly.