Services
EICR testing in Yourtown
Electrical Installation Condition Reports for landlords, homeowners, buyers and businesses. Clear reports, fair prices and quick turnaround.
What is an EICR?
An Electrical Installation Condition Report is a detailed inspection and test of the fixed wiring in a property. It identifies anything that is damaged, deteriorated, defective or does not meet current safety standards.
Landlords in England must have an EICR at least every 5 years and give a copy to tenants. Homeowners are advised to have one every 10 years or when buying a property.
- Satisfactory or unsatisfactory result explained clearly
- Report emailed within 24 hours
- Fixed price remedial quotes
- Reminders when your next test is due

What the inspection covers
A thorough check of your installation, carried out to BS 7671 and IET Guidance Note 3.
Consumer unit inspection
Checking the condition, rating and labelling of your fuse board and protective devices.
Circuit testing
Continuity, insulation resistance and polarity tests on every circuit.
RCD testing
Making sure your RCDs trip fast enough to protect against electric shock.
Earthing and bonding
Checking the main earth and bonding to gas and water pipes.
Sockets, switches and fittings
Sampling accessories for damage, overheating and loose connections.
Coded observations
Any issues are coded C1, C2, C3 or FI so you know what is urgent.
EICR prices
Fixed prices for most properties. Larger or commercial installations are quoted individually.
Flat or apartment
Up to 2 bedrooms- Up to 8 circuits
- Full written report
- Report within 24 hours
House
3 to 4 bedrooms- Up to 12 circuits
- Full written report
- Report within 24 hours
- Landlord copy for tenants
Commercial
Shops, offices and units- Testing out of hours
- Sampling plan agreed
- Detailed schedule of tests
Example prices shown. Edit these to match your own pricing.
Questions about eicrs
Everything landlords and homeowners ask about EICRs.
How long does an EICR take?
Most homes take 2 to 4 hours. The power will be off for short periods while circuits are tested.
What do C1, C2 and C3 mean?
C1 means danger present, C2 means potentially dangerous, and C3 means improvement recommended. C1 or C2 codes, or an FI, make the report unsatisfactory.
What happens if my report is unsatisfactory?
We will give you a fixed quote for the remedial work. Landlords must complete it within 28 days, or sooner if stated.
Do I need to be there?
Someone needs to give access. Landlords can arrange access with tenants and we will liaise with them directly.
Other services we offer
Residential electrical services | Commercial electrical services | Consumer unit upgrades | Lighting installation | Planned maintenance | Emergency call-outs
